Policy Verification

Fully automated · OCR + insurer-API cross-check · No human approval required

Automated engine active
Auto-verification log

Policies are validated against insurer records the moment they are submitted.

L&T Construction

Krishna Lift Irrigation Scheme · PKG-KR-03 Pumping Station Civil Works

· Source: Insurer API (IRDAI)

Auto-rejected

Patel Engineering

Krishna Lift Irrigation Scheme · PKG-KR-07 Pipeline Network — Reach 7

Auto-verified · 2h ago · Source: OCR + Policy registry

Auto-verified

Afcons Infrastructure

Gosikhurd Dam — Phase II · PKG-GS-02 Spillway Gates & Hoists

Auto-verified · 3h ago · Source: Insurer API (IRDAI)

Auto-verified

NCC Limited

Gosikhurd Dam — Phase II · PKG-GS-05 Embankment & Slope Protection

Auto-verified · 4h ago · Source: OCR + Policy registry

Auto-verified

Megha Engineering (MEIL)

Narmada Canal Network · PKG-NR-05 Canal Lining — Distributary D-5

· Source: Insurer API (IRDAI)

Auto-rejected

Jaiprakash Associates

Polavaram Spillway Works · PKG-PV-01 EPC Civil — Main Spillway

Auto-verified · 6h ago · Source: OCR + Policy registry

Auto-verified

Gammon India

Urban Water Supply — Pune · PKG-PN-02 Treatment Plant — 120 MLD

Auto-verified · 7h ago · Source: Insurer API (IRDAI)

Auto-verified

HCC Ltd.

Ken-Betwa River Linking · PKG-KB-04 Tunnel & Aqueduct — Reach 4

Auto-verified · 8h ago · Source: OCR + Policy registry

Auto-verified

L&T Construction

Krishna Lift Irrigation Scheme · PKG-KR-15 Distributary D-9 Lining

· Source: Insurer API (IRDAI)

Auto-rejected

L&T Construction

Narmada Canal Network · PKG-NR-09 Head Regulator — RBC

Auto-verified · 10h ago · Source: OCR + Policy registry

Auto-verified

L&T Construction

Polavaram Spillway Works · PKG-PV-06 Power Block Civil — Unit 2

Auto-verified · 11h ago · Source: Insurer API (IRDAI)

Auto-verified

NCC Limited

Gosikhurd Dam — Phase II · PKG-GS-08 Right Bank Canal — Reach 3

Auto-verified · 12h ago · Source: OCR + Policy registry

Auto-verified

Gammon India

Urban Water Supply — Pune · PKG-PN-01 Intake Well & Approach Bridge

· Source: Insurer API (IRDAI)

Auto-rejected

HCC Ltd.

Ken-Betwa River Linking · PKG-KB-01 Approach Roads & Bridges

Auto-verified · 14h ago · Source: OCR + Policy registry

Auto-verified